The construction of the new Wakefield Highschool (Arlington Public Schools) was completed in the Fall of 2014 and was designed to achieve LEED Gold certification. The geothermal heating and cooling (GeoHC) system was key for the certification. The building was designed to improve learning opportunities for its students while also serving as a welcoming and accessible facility for community members.

Wakefield accomodates 2,100 students and features classrooms, drama and music practic rooms, science and tehcnical labs, a competition-level gym, pool, library, and an auditorium. The planning process involved a strategic planning process centering stakeholder engagement to prioritize opportunities for under-utilized spaces to better serve student and community interests.

The GeoHC system was installed in a final phase of the construction, in the location of the demolished former school. It performed so well the Arlington School Board decided it was worth purging and flushing after 6 years to keep it in operation – including pressure testing and balancing of all the geothermal wells, vaults, and connecting lines outside and inside the building.

Key Findings

  • GeoHC can held a building achieve LEED Gold
  • 409,820 square-foot school operating at least 12 hours per day
  • Consumes 50% less energy than a typical building of its size
  • GeoHC is an infrastructural investment worth maintaining